基坑圍欄的制作工藝流程是怎樣的?有哪些具體的流程?
來(lái)源:http://m.hbxcsyj.com/ 發(fā)布時(shí)間:2022-02-05
先篩選材料并采購(gòu)(盤條、鐵絲、管材)——進(jìn)廠檢驗(yàn)---調(diào)試機(jī)器和網(wǎng)片生產(chǎn)---檢驗(yàn)與大貨的過(guò)程檢驗(yàn)---胎具制作、框架下料與焊接---檢驗(yàn)與過(guò)程檢驗(yàn)----網(wǎng)片與框架的連(焊)接--檢驗(yàn)與過(guò)程檢驗(yàn)---立柱下料、折彎成型、邊耳焊接---檢驗(yàn)與過(guò)程檢驗(yàn)---配套安裝檢驗(yàn)---電鍍鋅或熱鍍鋅處理及檢驗(yàn)---浸塑處理及檢驗(yàn)---成品抽檢或全檢檢驗(yàn)---入庫(kù)倉(cāng)儲(chǔ)----運(yùn)輸。
First select materials and purchase(wire rod,iron wire and pipe)-incoming inspection-commissioning machine and mesh production-Inspection and process inspection of large goods-mould production,frame blanking and welding-Inspection and process inspection-connection(welding)between mesh and frame-Inspection and process inspection-column blanking,bending and forming Side lug welding-Inspection and process inspection-supporting installation inspection-electro galvanizing or hot galvanizing treatment and inspection-plastic dipping treatment and inspection-sampling inspection or full inspection of finished products-warehousing-transportation.
陜西基坑圍欄
Shaanxi foundation pit fence
基坑圍欄電鍍鋅工藝:網(wǎng)片電鍍前的檢驗(yàn)→除銹→水洗→氧化→鍍鋅→鈍化→清洗--晾干→檢驗(yàn)
Electro galvanizing process of foundation pit fence:inspection before mesh electroplating→rust removal→water washing→oxidation→galvanizing→passivation→cleaning-drying→inspection
基坑圍欄熱鍍鋅工藝:網(wǎng)片熱鍍鋅前的檢驗(yàn)→脫脂→水洗→酸洗---水洗→浸注鍍?nèi)芤?rarr;烘干預(yù)熱→熱鍍鋅→整理冷卻→鈍化→漂洗→干燥→檢驗(yàn)
Hot dip galvanizing process of foundation pit fence:inspection before hot dip galvanizing of mesh→degreasing→water washing→Pickling-water washing→dipping plating solution→drying and preheating→hot dip galvanizing→finishing and cooling→passivation→rinsing→drying→inspection
基坑圍欄浸塑工藝:網(wǎng)片浸塑前的檢驗(yàn)—除油打砂—預(yù)熱—浸塑—吊掛入倉(cāng)—烘干溜平—檢驗(yàn)—成品入庫(kù)清點(diǎn)—出庫(kù)運(yùn)輸
Plastic dipping process of foundation pit fence:inspection before plastic dipping of mesh-degreasing and sanding-preheating-plastic dipping-hanging and warehousing-drying and smoothing-Inspection-warehousing and counting of finished products-outbound transportation
基坑圍欄網(wǎng)片焊接工藝:采購(gòu)盤條或鐵絲—-驗(yàn)證材質(zhì)---大拔、冷拔絲經(jīng)的抽檢—-校直截?cái)嗉敖z徑隨時(shí)測(cè)量-—調(diào)機(jī)試生產(chǎn)并經(jīng)檢驗(yàn)片網(wǎng)--—批量生產(chǎn)和過(guò)程檢驗(yàn)--—網(wǎng)片抽檢
Welding process of foundation pit fence mesh:purchase wire rod or iron wire-verify material-Sampling Inspection of large drawn and cold drawn wire-straightening and cutting and measuring wire diameter at any time-adjust the machine for trial production and pass the inspection mesh-batch production and process inspection-Sampling Inspection of mesh
基坑圍欄網(wǎng)框焊接工藝:采購(gòu)所需邊框管材—檢驗(yàn)壁厚長(zhǎng)度重量—---胎具制作和檢驗(yàn)—下料截?cái)?--焊接邊框—網(wǎng)片與邊框焊接-—網(wǎng)框與立柱結(jié)構(gòu)安裝檢驗(yàn)—批量焊接生產(chǎn)—過(guò)程檢驗(yàn)---大貨清點(diǎn)抽檢---半成品清點(diǎn)或倉(cāng)儲(chǔ)。
Welding process of fence net frame of foundation pit:purchase the required frame pipes-inspect the wall thickness,length and weight-mould production and inspection-blanking and cutting-weld the frame-welding between mesh and frame-installation inspection of net frame and column structure-batch welding production-process inspection-bulk inventory and sampling inspection-inventory or storage of semi-finished products.
基坑圍欄立柱制作工藝:采購(gòu)所需尺寸的鐵管—檢驗(yàn)壁厚長(zhǎng)度重量—胎具制作和檢驗(yàn)----下料截?cái)?mdash;折彎成型---焊接邊耳----立柱邊耳尺寸檢驗(yàn)(或與網(wǎng)框的結(jié)構(gòu)安裝)—批量焊接—過(guò)程抽檢—大貨清點(diǎn)或倉(cāng)儲(chǔ)。
Manufacturing process of foundation pit fence column:purchase of iron pipes of required size-Inspection of wall thickness,length and weight-mould making and inspection-blanking and cutting-bending forming-welding side lug-Inspection of column side lug size(or structural installation with mesh frame)-batch welding-process sampling inspection-Bulk goods counting or storage.
以上的內(nèi)容分享來(lái)自于陜西名威裝飾工程有限公司的小編為大家進(jìn)行分享的,如果大家還有其他的相關(guān)疑問(wèn)的話歡迎給我們進(jìn)行來(lái)電!
The above content is shared by Xiaobian from Shaanxi Mingwei Decoration Engineering Co.,Ltd.for you.If you have other relevant questions,please call us!